A Brief Introduction to the Project of Producing 200,000 tons of Concentrated Tron Powder annually |
Project Discribe: |
The project is in Shuangtashan Town. The original productive capacity of concentrated iron powder approved is 200,000 tons, and a half has been reached. The total investment of the second half is 5million U.S. dollars, all is planned to use foreign capital. After the mineral resources integrating, the operating areas have been expanded to five ,The resource storage is about 35 million tons, about 15 million tons is high grade. The minging period is more than 15 years. |
| Investment Area: |
承德市双滦区 |
Total Investment: |
总投资500万美元;5million U.S. dollars |
| Proportion of Foreign Investment: |
|
Cooperation Method: |
合资,合作,其他 |
| Marketing and Economic Analysis: |
After the completion of the project, annual output of ore will reach one million tons, net income 4.286million U.S. dollars. Annual sales of concentrated iron powder will reach 200,000 tons, net income 8.571 million U.S. dollars. |
Project Progress: |
|
| Remark: |
中方企业概况:铁都矿业有限公司成立于2005年,年处理原矿能力60万吨,年生产铁粉能力10万吨。 |
|
|